GENERAL CONSTRUCTION WORKS TO BE CARRIED OUT IN MARCH 2025
House 1
Plastering the walls in the 2nd section on the 5th floor.
Installation of the heating system in the 2nd section on the 2nd floor.
Electrical installation work in the 2nd section on the 5th floor.
Installation of ventilation ducts in the parking lot.
House 2
Completion of roofing work in the 2nd section.
Installation of the 4th floor floor slab.
Masonry of walls on the 1st floor.
Installation of ventilation ducts on the 2nd floor.
House 3
Installation of the 3rd floor floor slab.
Installation of ventilation ducts on the 2nd floor.
Masonry of walls on the 1st floor.