GENERAL CONSTRUCTION WORKS CARRIED OUT IN AUGUST 2024
Works as of the beginning of August:
Concreting of the 6th-floor slab in section 1.
Installation of vertical structures for the 6th floor in section 2.
Masonry of exterior walls on the 1st floor of sections 1 and 2.
Masonry of ventilation ducts on the 5th floor of sections 1 and 2.
Installation of the ACS (Access Control System) on the 5th floor of sections 1 and 2.
Installation of horizontal waterproofing for the parking lot.